chore(deps): lock file maintenance #18

Merged
renovate merged 2 commits from renovate/lock-file-maintenance into main 2025-06-19 19:51:38 +02:00
Collaborator

This PR contains the following updates:

Update Change
lockFileMaintenance All locks refreshed

🔧 This Pull Request updates lock files to use the latest dependency versions.


Configuration

📅 Schedule: Branch creation - "before 4am on Monday" (UTC), Automerge - At any time (no schedule defined).

🚦 Automerge: Enabled.

Rebasing: Whenever PR is behind base branch, or you tick the rebase/retry checkbox.

👻 Immortal: This PR will be recreated if closed unmerged. Get config help if that's undesired.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Update | Change | |---|---| | lockFileMaintenance | All locks refreshed | 🔧 This Pull Request updates lock files to use the latest dependency versions. --- ### Configuration 📅 **Schedule**: Branch creation - "before 4am on Monday" (UTC), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Enabled. ♻ **Rebasing**: Whenever PR is behind base branch, or you tick the rebase/retry checkbox. 👻 **Immortal**: This PR will be recreated if closed unmerged. Get [config help](https://github.com/renovatebot/renovate/discussions) if that's undesired. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiIzOC4xMDUuMiIsInVwZGF0ZWRJblZlciI6IjM4LjEwNS4yIiwidGFyZ2V0QnJhbmNoIjoibWFpbiIsImxhYmVscyI6W119-->
chore(deps): lock file maintenance
Some checks failed
CI / build (push) Failing after 9m46s
359a7bbe3b
renovate scheduled this pull request to auto merge when all checks succeed 2025-06-16 00:10:09 +02:00
Author
Collaborator

Branch automerge failure

This PR was configured for branch automerge. However, this is not possible, so it has been raised as a PR instead.


  • Branch has one or more failed status checks
### Branch automerge failure This PR was configured for branch automerge. However, this is not possible, so it has been raised as a PR instead. ___ * Branch has one or more failed status checks
Update all inputs
All checks were successful
CI / build (push) Successful in 1m15s
baa0bf6888
Author
Collaborator

Edited/Blocked Notification

Renovate will not automatically rebase this PR, because it does not recognize the last commit author and assumes somebody else may have edited the PR.

You can manually request rebase by checking the rebase/retry box above.

⚠️ Warning: custom changes will be lost.

### Edited/Blocked Notification Renovate will not automatically rebase this PR, because it does not recognize the last commit author and assumes somebody else may have edited the PR. You can manually request rebase by checking the rebase/retry box above. ⚠️ **Warning**: custom changes will be lost.
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
2 participants
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference: fabianhauser/dotfiles#18
No description provided.